Changes between Version 1 and Version 2 of Research/LhARA/RadiationBiology/Meetings/2026-07-09
- Timestamp:
- Jul 9, 2026, 3:19:50 PM (3 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/RadiationBiology/Meetings/2026-07-09
v1 v2 3 3 **ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1 4 4 5 == Meeting Agenda == 5 Attended: KL, CW, CD, (JB) 6 6 7 1. SCAPA 8 - General Update 7 == Meeting Notes == 9 8 10 2. BioPrep 11 - General Update 9 1. General Discussion 10 - Robbie mentioned that beamtime might be more likely in February. 11 - Colin believes we might be able to get some time in Autumn if we can time it correctly with other beamtime. 12 - There is work where the SCAPA team are using AI and looking at the variability of the laser. 13 - Colin to discuss with Robbie how to build the setup with another experiment 12 14 13 3. Instrumentation 14 - General Update 15 - Lenses ordered for Hollow Fibre Testing 15 2. Instrumentation 16 - General 17 - Colin suggested filling the carousel and running 1 shot then repeating with 2 shots etc 18 - Each cell dish would have Lanex around it or something for real-time measurement 19 - Then we could skip the calibration stage by comparing the variation in the Lanex signal with the known variation in dose 20 - Problems involve the number of cells needing to be collected and the time that would take 21 - Needs discussion with bio team 22 - SciFi 23 - Need to actually test whether the transporting fibre will scintillate 24 - Operate on the assumption it does not 25 - If it does Peter has ordered hollow-fibre 26 - Might be able to use a standrad fibre-optic connector 27 - ICT 28 - Colin has ICTs 29 - 3-5ns rise time, so should see the short pulses but on the edge of visible and may be blurred out 30 - 0.1V in signal per Amp in beam current 31 - Beam would also need to be roughly symmetric, so has to be after the scatterer 16 32 17 4. Equipment Procurement 18 - General Update 19 20 5. Alternate Beamlines 21 - ELI Update 22 23 6. Overview of Trello 33 3. Overview of Trello 34 - Reminder plan is laid out in the google doc and can be changed 24 35 - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar 25 36 - Planning next SCAPA Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing 26 37 27 7. DoNM38 4. DoNM 28 39 - 23/07/26 29 40 30 8. AoB41 5. AoB 31 42 32 43
