| Version 1 (modified by , 5 days ago) ( diff ) |
|---|
LhARA radiobiology; meeting: 09Jul26; 14:00 GMT
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
Meeting Agenda
- SCAPA
- General Update
- BioPrep
- General Update
- Instrumentation
- General Update
- Lenses ordered for Hollow Fibre Testing
- Equipment Procurement
- General Update
- Alternate Beamlines
- ELI Update
- Overview of Trello
- DoNM
- 23/07/26
- AoB
Summary of actions required
In-Beam Diagnostics
- Unassigned: Acquire a glass sheet
- Unassigned: Get a new RCF batch and calibrate
- TP: Testing delaminating EBT3
- PH: Obtain transparent fibre or an alternative method for light transport
- PH: Obtain lens for hollow fibre tests
- CD: Simulate energy deposited in transport fibres
- KL, CD, JMcG, PH: Design a system to make full scifi prototypes
- KL, CD, JMcG, PH: Make a full scifi prototype
- KL, CD, JMcG, PH: Discuss visit to Birmingham to test SciFi
- RW, CD: Study correlation between laser diagnostics and mean dose
- Unassigned: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
- CW: Obtain ICTs?
Bio Next Steps
- EM, CD, JMcG: Write up technical summary of Phase 2
- EM: Write up a biology plan for a 2 PMQ setup
- Unassigned: Obtain an inverted microscope
- Unassigned: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
- Unassigned: Obtain a thermostat for the incubator
- MB, JP, MB: Meet up to plan cell survival dry run and a bio plan for a 2 Quad setup
- EM: Run controls to examine how long the cells can survive vertically
Beamline Modelling
- CD: Examine energy spectra variation
- RW, CD: Source characterisation
Alternate Beamlines
- JMcG: Simulate BELLA
- JMcG: Simulate ELI
Note:
See TracWiki
for help on using the wiki.
