Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2026-07-09


Ignore:
Timestamp:
Jul 7, 2026, 2:07:19 PM (5 days ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2026-07-09

    v1 v1  
     1= LhARA radiobiology; meeting: 09Jul26; 14:00 GMT =
     2
     3**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
     4
     5== Meeting Agenda ==
     6
     71. SCAPA
     8 - General Update
     9
     102. BioPrep
     11 - General Update
     12
     133. Instrumentation
     14 - General Update
     15 - Lenses ordered for Hollow Fibre Testing
     16
     174. Equipment Procurement
     18 - General Update
     19
     205. Alternate Beamlines
     21 - ELI Update
     22
     236. Overview of Trello
     24 - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     25 - Planning next SCAPA Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing
     26
     277. DoNM
     28 - 23/07/26
     29
     308. AoB
     31
     32
     33=== Summary of actions required ===
     34
     35In-Beam Diagnostics
     36- **Unassigned**: Acquire a glass sheet
     37- **Unassigned**: Get a new RCF batch and calibrate
     38- **TP**: Testing delaminating EBT3
     39- **PH**: Obtain transparent fibre or an alternative method for light transport
     40- **PH**: Obtain lens for hollow fibre tests
     41- **CD**: Simulate energy deposited in transport fibres
     42- **KL, CD, JMcG, PH**: Design a system to make full scifi prototypes
     43- **KL, CD, JMcG, PH**: Make a full scifi prototype
     44- **KL, CD, JMcG, PH**: Discuss visit to Birmingham to test SciFi
     45- **RW, CD**: Study correlation between laser diagnostics and mean dose
     46- **Unassigned**: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
     47- **CW**: Obtain ICTs?
     48
     49Bio Next Steps
     50- **EM, CD, JMcG**: Write up technical summary of Phase 2
     51- **EM**: Write up a biology plan for a 2 PMQ setup
     52- **Unassigned**: Obtain an inverted microscope
     53- **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
     54- **Unassigned**: Obtain a thermostat for the incubator
     55- **MB, JP, MB**: Meet up to plan cell survival dry run and a bio plan for a 2 Quad setup
     56- **EM**: Run controls to examine how long the cells can survive vertically
     57
     58Beamline Modelling
     59- **CD**: Examine energy spectra variation
     60- **RW, CD**: Source characterisation
     61
     62Alternate Beamlines
     63- **JMcG**: Simulate BELLA
     64- **JMcG**: Simulate ELI
     65
     66----