Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2026-06-25


Ignore:
Timestamp:
Jun 24, 2026, 5:23:21 PM (3 weeks ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2026-06-25

    v1 v1  
     1= LhARA radiobiology; meeting: 25Jun26; 14:00 GMT =
     2
     3**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
     4
     5== Meeting Agenda ==
     6
     71. Quick recap of plan for next SCAPA beamtime
     8 - (For anyone who has missed it so far)
     9 - Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing
     10 - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     11
     122. SCAPA
     13 - General Update
     14
     153. BioPrep
     16 - General Update
     17
     184. Instrumentation
     19 - General Update
     20
     215. Equipment Procurement
     22 - General Update
     23
     246. Alternate Beamlines
     25 - ELI Update
     26
     277. DoNM
     28 - 08/07/26
     29
     308. AoB
     31
     32
     33
     34=== Summary of actions required ===
     35
     36In-Beam Diagnostics
     37- **Unassigned**: Acquire a glass sheet
     38- **Unassigned**: Get a new RCF batch and calibrate
     39- **MH**: Testing delaminating EBT3
     40- **PH**: Obtain transparent fibre or an alternative method for light transport
     41- **PH**: Obtain lens for hollow fibre tests
     42- **CD**: Simulate energy deposited in transport fibres
     43- **KL, CD, JMcG, PH**: Design a system to make full scifi prototypes
     44- **KL, CD, JMcG, PH**: Make a full scifi prototype
     45- **KL, CD, JMcG, PH**: Discuss visit to Birmingham to test SciFi
     46- **RW, CD**: Study correlation between laser diagnostics and mean dose
     47- **Unassigned**: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
     48- **CW**: Obtain ICTs?
     49
     50Bio Next Steps
     51- **EM, CD, JMcG**: Write up technical summary of Phase 2
     52- **EM**: Write up a biology plan for a 2 PMQ setup
     53- **Unassigned**: Obtain an inverted microscope
     54- **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
     55- **Unassigned**: Obtain a thermostat for the incubator
     56- **MB, JP, MB**: Meet up to plan cell survival dry run and a bio plan for a 2 Quad setup
     57- **EM**: Run controls to examine how long the cells can survive vertically
     58
     59Beamline Modelling
     60- **CD**: Examine energy spectra variation
     61- **RW, CD**: Source characterisation
     62
     63Alternate Beamlines
     64- **JMcG**: Simulate BELLA
     65- **JMcG**: Simulate ELI
     66
     67----